Electrical panel grounding requirements. Contact us for a consultation on your project. To make the connection slide the end of the grounding electrode conductor through one of the holes in the bus and tighten the screw in that hole until it holds the wire very tightly. Although the piping system is bonded to the ground through your main electrical service panel the panel grounding and the piping bonding are unrelated when it comes to function. Grounding bonding 2 in our example the service equipment for the home is the 200 amp main breaker panel.
When grounding an electrical panel the following applies. However if this 200 amp main breaker panel can t be immediately installed on the. Nec article 250 does not specify a minimum or maximum distance between the main electrical panel and the ground rod. The rest of article 250 covers how to achieve this desired level of protection.
Section 250 4 lays out the performance requirements of grounding and bonding electrical systems. Grounding requirements for electric panels. Connect the grounding electrode conductor to the ground bus. 310 798 1038 e s grounding solutions 703 pier avenue suite b174 hermosa beach ca 90254.
Similar to the purpose statement of the nec we are given guidance toward the intended results and then a set of rules to follow. National electrical codes nec 250 5 grounding and bonding grounding and bonding electrodes include a metal underground water pipe in direct contact with earth for 10 feet or more a metal frame of a building or structure a concrete encased electrode or a ground ring nec 250 28 grounding and bonding grounding and bonding a main bonding jumper or the green bonding screw provided by the panel. Grounding of services grounding shall consist of a continuous grounding electrode conductor run from the panel to a ground rod grounding electrode and to the cold water pipe. Grounding of the electrical service at the main water line must be within the first 5 of water piping into the building.
Because the panel must be connected to the ground rod by a buried copper wire.